30 years · professional boiler manufacturer & system integrator

Specification before quotation

Industrial Boiler Engineering Tools for Process Plants

Calculators, comparison logic and project-input checklists

This is JIELI’s engineering decision center: convert duty, estimate preliminary heater size, compare thermal oil with steam, and prepare the technical data needed for a credible quotation.

Heat-duty basiskcal/h · kW · MW
System inputsTemperature · flow · pressure
Commercial clarityFuel · efficiency · supply scope
Installed industrial thermal oil heater system used as engineering referenceReal installed system · engineering decisions connected to field conditions

Decision center

Use the tool that matches the question you need to answer

These pages are intentionally separate from the JIELI THERMAL product catalogue. They help owners, consultants and procurement teams define the engineering basis before comparing manufacturers.

01 / CALCULATE

Thermal oil heater sizing calculator

Convert useful process duty, apply design margin and efficiency, and estimate preliminary gas or diesel input without pretending that capacity alone completes the selection.

Calculate preliminary heater duty
02 / COMPARE

Thermal oil heater vs steam boiler

Compare phase change, system pressure, temperature range, water treatment, condensate, control response and typical process fit.

Choose the heating medium
03 / SPECIFY

Thermal oil system selection inputs

Review heat duty, outlet and return temperature, process flow, thermal-fluid limits, fuel, emissions, controls and supply boundary.

Open the eight-input checklist
04 / RECOVER

Steam condensate loss analysis

See the sensible-heat value of unrecovered saturated condensate from 2 to 12 kg pressure and change fuel-price assumptions in US dollars.

Open condensate analysis

How to use the results

Turn a quick calculation into a defensible RFQ

A useful preliminary result should become a written selection basis, not an isolated headline capacity. Record the assumptions so every bidder prices the same operating duty and supply boundary.

  1. Define the process load.Normal, minimum, peak and startup duty.
  2. Define the operating medium.Thermal fluid supply/return temperatures or steam pressure and condition.
  3. Define site constraints.Fuel quality, emissions, water, layout and delivery limits.
  4. Define the package boundary.Combustion, pumps, tanks, water treatment, controls and heat recovery.
Industrial boiler automatic control system used in complete system integration

Engineering review

Send the calculation basis, not only the requested boiler name.

Share duty, temperature or pressure, fuel, process, operating hours, emissions requirements and project country.

Email engineering basis